Data Pencairan:
SD: 2024-11-30
SMP: 2024-11-30
SMA: 2024-11-30
SMK: 2024-11-30
|
|
Disalurkan |
Pemberian |
Pemberian Dari Aktivasi Nominasi |
Pemberian Relaksasi |
SD ISLAM INTEGRAL HIDAYATULLAH BANJARBARU (69990572) |
|
Siswa |
17 |
4 |
4 |
9 |
|
Dana |
7.425.000 |
1.800.000 |
1.800.000 |
3.825.000 |
|
SD NEGERI 1 BANGKAL (30304619) |
|
Siswa |
108 |
58 |
10 |
40 |
|
Dana |
41.850.000 |
23.850.000 |
4.500.000 |
13.500.000 |
|
SD NEGERI 1 CEMPAKA (30304654) |
|
Siswa |
32 |
11 |
18 |
3 |
|
Dana |
14.175.000 |
4.950.000 |
8.100.000 |
1.125.000 |
|
SD NEGERI 1 PALAM (30304551) |
|
Siswa |
94 |
63 |
4 |
27 |
|
Dana |
37.575.000 |
26.325.000 |
1.800.000 |
9.450.000 |
|
SD NEGERI 1 SUNGAI TIUNG (30304547) |
|
Siswa |
176 |
105 |
23 |
48 |
|
Dana |
66.375.000 |
41.850.000 |
10.350.000 |
14.175.000 |
|
SD NEGERI 2 BANGKAL (30304620) |
|
Siswa |
89 |
54 |
9 |
26 |
|
Dana |
34.650.000 |
21.825.000 |
3.825.000 |
9.000.000 |
|
SD NEGERI 2 CEMPAKA (30304649) |
|
Siswa |
18 |
13 |
3 |
2 |
|
Dana |
8.100.000 |
5.850.000 |
1.350.000 |
900.000 |
|
SD NEGERI 2 PALAM (30304550) |
|
Siswa |
58 |
43 |
8 |
7 |
|
Dana |
24.300.000 |
18.225.000 |
3.375.000 |
2.700.000 |
|
SD NEGERI 2 SUNGAI TIUNG (30304548) |
|
Siswa |
64 |
27 |
2 |
35 |
|
Dana |
28.125.000 |
11.925.000 |
900.000 |
15.300.000 |
|
SD NEGERI 3 BANGKAL (30304621) |
|
Siswa |
29 |
18 |
0 |
11 |
|
Dana |
13.050.000 |
8.100.000 |
0 |
4.950.000 |
|
SD NEGERI 3 CEMPAKA (30304641) |
|
Siswa |
58 |
36 |
2 |
20 |
|
Dana |
24.525.000 |
15.300.000 |
675.000 |
8.550.000 |
|
SD NEGERI 3 PALAM (30304541) |
|
Siswa |
63 |
38 |
22 |
3 |
|
Dana |
25.200.000 |
14.400.000 |
9.675.000 |
1.125.000 |
|
SD NEGERI 3 SUNGAI TIUNG (30304549) |
|
Siswa |
55 |
42 |
0 |
13 |
|
Dana |
21.825.000 |
17.325.000 |
0 |
4.500.000 |
|
SD NEGERI 4 CEMPAKA (30304642) |
|
Siswa |
86 |
69 |
13 |
4 |
|
Dana |
37.350.000 |
29.925.000 |
5.625.000 |
1.800.000 |
|
SD NEGERI 5 CEMPAKA (30304655) |
|
Siswa |
75 |
38 |
27 |
10 |
|
Dana |
32.850.000 |
16.650.000 |
12.150.000 |
4.050.000 |
|
SD NEGERI 6 CEMPAKA (30304650) |
|
Siswa |
56 |
31 |
0 |
25 |
|
Dana |
23.400.000 |
12.600.000 |
0 |
10.800.000 |
|
Total |
Siswa |
0 |
0 |
0,00% |
Total |
Rp |
0 |
0 |
0,00% |