Data Pencairan:
SD: 2025-01-15
SMP: 2025-01-15
SMA: 2025-01-15
SMK: 2025-01-15
|
|
Disalurkan |
Pemberian |
Pemberian Dari Aktivasi Nominasi |
Pemberian Relaksasi |
SD NEGERI 01 SEMANGET (30102109) |
|
Siswa |
50 |
41 |
3 |
6 |
|
Dana |
20.700.000 |
17.775.000 |
1.350.000 |
1.575.000 |
|
SD NEGERI 02 PANGA (30102125) |
|
Siswa |
57 |
48 |
9 |
0 |
|
Dana |
24.075.000 |
20.025.000 |
4.050.000 |
0 |
|
SD NEGERI 03 SONTAS (30102103) |
|
Siswa |
72 |
69 |
0 |
3 |
|
Dana |
30.375.000 |
29.475.000 |
0 |
900.000 |
|
SD NEGERI 04 PUNTI TAPAU (30101996) |
|
Siswa |
63 |
28 |
35 |
0 |
|
Dana |
26.550.000 |
10.800.000 |
15.750.000 |
0 |
|
SD NEGERI 05 SURUH TEMBAWANG (30101976) |
|
Siswa |
20 |
17 |
3 |
0 |
|
Dana |
8.775.000 |
7.425.000 |
1.350.000 |
0 |
|
SD NEGERI 06 MERAU (30101985) |
|
Siswa |
30 |
19 |
11 |
0 |
|
Dana |
13.275.000 |
8.325.000 |
4.950.000 |
0 |
|
SD NEGERI 07 MANGKAU (30102041) |
|
Siswa |
43 |
26 |
17 |
0 |
|
Dana |
18.675.000 |
11.025.000 |
7.650.000 |
0 |
|
SD NEGERI 08 NEKAN (30102018) |
|
Siswa |
52 |
41 |
11 |
0 |
|
Dana |
22.500.000 |
17.550.000 |
4.950.000 |
0 |
|
SD NEGERI 10 POOL (30102207) |
|
Siswa |
33 |
30 |
2 |
1 |
|
Dana |
13.725.000 |
12.600.000 |
900.000 |
225.000 |
|
SD NEGERI 11 SEKAJANG (30102231) |
|
Siswa |
17 |
10 |
0 |
7 |
|
Dana |
7.650.000 |
4.500.000 |
0 |
3.150.000 |
|
SD NEGERI 12 ENTIKONG (30102279) |
|
Siswa |
83 |
40 |
0 |
43 |
|
Dana |
35.325.000 |
15.975.000 |
0 |
19.350.000 |
|
SD NEGERI 13 PUNTI KAYAN (30102259) |
|
Siswa |
47 |
40 |
7 |
0 |
|
Dana |
20.700.000 |
17.550.000 |
3.150.000 |
0 |
|
SD NEGERI 14 BADAT (30102268) |
|
Siswa |
22 |
21 |
0 |
1 |
|
Dana |
9.900.000 |
9.450.000 |
0 |
450.000 |
|
SD NEGERI 15 SENUTUL (30102146) |
|
Siswa |
35 |
30 |
0 |
5 |
|
Dana |
15.300.000 |
13.050.000 |
0 |
2.250.000 |
|
SD NEGERI 16 GUN JEMAK (30102138) |
|
Siswa |
11 |
0 |
0 |
11 |
|
Dana |
4.950.000 |
0 |
0 |
4.950.000 |
|
SD NEGERI 17 PALA PASANG (30102194) |
|
Siswa |
40 |
30 |
10 |
0 |
|
Dana |
16.875.000 |
12.375.000 |
4.500.000 |
0 |
|
SD NEGERI 9 SERANGKANG (30102244) |
|
Siswa |
38 |
28 |
10 |
0 |
|
Dana |
16.875.000 |
12.375.000 |
4.500.000 |
0 |
|
Total |
Siswa |
0 |
0 |
0,00% |
Total |
Rp |
0 |
0 |
0,00% |