Data Pencairan:
SD: 2025-01-15
SMP: 2025-01-15
SMA: 2025-01-15
SMK: 2025-01-15
|
|
Disalurkan |
Pemberian |
Pemberian Dari Aktivasi Nominasi |
Pemberian Relaksasi |
SD NEGERI 1 ASTAPADA (20214898) |
|
Siswa |
185 |
158 |
12 |
15 |
|
Dana |
73.350.000 |
62.325.000 |
4.950.000 |
6.075.000 |
|
SD NEGERI 1 BATEMBAT (20215236) |
|
Siswa |
126 |
113 |
2 |
11 |
|
Dana |
49.950.000 |
45.675.000 |
900.000 |
3.375.000 |
|
SD NEGERI 1 DAWUAN (20215308) |
|
Siswa |
169 |
110 |
40 |
19 |
|
Dana |
69.075.000 |
46.350.000 |
17.775.000 |
4.950.000 |
|
SD NEGERI 1 GESIK (20215250) |
|
Siswa |
331 |
193 |
75 |
63 |
|
Dana |
130.500.000 |
79.425.000 |
33.525.000 |
17.550.000 |
|
SD NEGERI 1 KALIBARU (69725666) |
|
Siswa |
17 |
5 |
0 |
12 |
|
Dana |
5.400.000 |
2.250.000 |
0 |
3.150.000 |
|
SD NEGERI 1 KALITENGAH (20215071) |
|
Siswa |
279 |
205 |
45 |
29 |
|
Dana |
110.025.000 |
83.250.000 |
18.900.000 |
7.875.000 |
|
SD NEGERI 1 KEMLAKA GEDE (20215151) |
|
Siswa |
75 |
68 |
7 |
0 |
|
Dana |
30.825.000 |
27.675.000 |
3.150.000 |
0 |
|
SD NEGERI 1 PALIR (20215034) |
|
Siswa |
70 |
44 |
6 |
20 |
|
Dana |
23.850.000 |
14.850.000 |
2.700.000 |
6.300.000 |
|
SD NEGERI 2 BATEMBAT (20215525) |
|
Siswa |
130 |
110 |
15 |
5 |
|
Dana |
53.775.000 |
45.450.000 |
6.750.000 |
1.575.000 |
|
SD NEGERI 2 GESIK (20215314) |
|
Siswa |
44 |
27 |
0 |
17 |
|
Dana |
16.425.000 |
12.150.000 |
0 |
4.275.000 |
|
SD NEGERI 2 KEMLAKA GEDE (20215404) |
|
Siswa |
137 |
96 |
18 |
23 |
|
Dana |
54.900.000 |
40.725.000 |
7.875.000 |
6.300.000 |
|
SD NEGERI 3 DAWUAN (20214470) |
|
Siswa |
220 |
172 |
27 |
21 |
|
Dana |
91.350.000 |
71.775.000 |
11.925.000 |
7.650.000 |
|
SD NEGERI 3 KEMLAKA GEDE (20214599) |
|
Siswa |
93 |
88 |
5 |
0 |
|
Dana |
38.250.000 |
36.450.000 |
1.800.000 |
0 |
|
SD NEGERI 4 DAWUAN (20214959) |
|
Siswa |
98 |
66 |
16 |
16 |
|
Dana |
38.925.000 |
27.225.000 |
7.200.000 |
4.500.000 |
|
SDIT AL FURQON (69970173) |
|
Siswa |
91 |
70 |
5 |
16 |
|
Dana |
37.350.000 |
30.825.000 |
2.250.000 |
4.275.000 |
|
UPTD SD NEGERI 1 KEMLAKA GEDE (20215151) |
|
Siswa |
43 |
4 |
0 |
39 |
|
Dana |
12.600.000 |
1.800.000 |
0 |
10.800.000 |
|
Total |
Siswa |
0 |
0 |
0,00% |
Total |
Rp |
0 |
0 |
0,00% |