Kecamatan Kec. Bumiaji
Data Pencairan:
SD: 2024-08-31
SMP: 2024-08-31
SMA: 2024-08-30
SMK: 2024-08-30
|
|
Sk |
Aktivasi |
% |
PKBM TAMAN KRIDA DEWASA (P2966736) |
|
Siswa |
5 |
0 |
0,00% |
|
Dana |
2.250.000 |
0 |
0,00% |
|
SD MUHAMMADIYAH 05 BATU (20536847) |
|
Siswa |
1 |
0 |
0,00% |
|
Dana |
450.000 |
0 |
0,00% |
|
SD NEGERI BULUKERTO 02 (20536854) |
|
Siswa |
1 |
0 |
0,00% |
|
Dana |
450.000 |
0 |
0,00% |
|
SD NEGERI BULUKERTO 03 (20536855) |
|
Siswa |
2 |
1 |
50,00% |
|
Dana |
675.000 |
225.000 |
33,33% |
|
SD NEGERI BUMIAJI 01 (20536856) |
|
Siswa |
2 |
2 |
100,00% |
|
Dana |
900.000 |
900.000 |
100,00% |
|
SD NEGERI GIRIPURNO 01 (20536876) |
|
Siswa |
2 |
0 |
0,00% |
|
Dana |
900.000 |
0 |
0,00% |
|
SD NEGERI GIRIPURNO 02 (20536877) |
|
Siswa |
10 |
10 |
100,00% |
|
Dana |
4.500.000 |
4.500.000 |
100,00% |
|
SD NEGERI GIRIPURNO 03 (20536878) |
|
Siswa |
10 |
5 |
50,00% |
|
Dana |
4.275.000 |
2.025.000 |
47,37% |
|
SD NEGERI GUNUNGSARI 01 (20536897) |
|
Siswa |
21 |
21 |
100,00% |
|
Dana |
9.450.000 |
9.450.000 |
100,00% |
|
SD NEGERI GUNUNGSARI 03 (20536899) |
|
Siswa |
2 |
0 |
0,00% |
|
Dana |
900.000 |
0 |
0,00% |
|
SD NEGERI GUNUNGSARI 04 BATU (20536900) |
|
Siswa |
2 |
2 |
100,00% |
|
Dana |
900.000 |
900.000 |
100,00% |
|
SD NEGERI PANDANREJO 01 (20536894) |
|
Siswa |
34 |
33 |
97,06% |
|
Dana |
14.850.000 |
14.400.000 |
96,97% |
|
SD NEGERI PANDANREJO 02 (20536879) |
|
Siswa |
13 |
13 |
100,00% |
|
Dana |
5.850.000 |
5.850.000 |
100,00% |
|
SD NEGERI PUNTEN 01 (20536884) |
|
Siswa |
7 |
7 |
100,00% |
|
Dana |
3.150.000 |
3.150.000 |
100,00% |
|
SD NEGERI SUMBERGONDO 01 (20536807) |
|
Siswa |
1 |
1 |
100,00% |
|
Dana |
225.000 |
225.000 |
100,00% |
|
SD NEGERI TULUNGREJO 01 (20536776) |
|
Siswa |
3 |
3 |
100,00% |
|
Dana |
1.350.000 |
1.350.000 |
100,00% |
|
SD NEGERI TULUNGREJO 02 (20539421) |
|
Siswa |
5 |
5 |
100,00% |
|
Dana |
2.250.000 |
2.250.000 |
100,00% |
|
SD NEGERI TULUNGREJO 03 (20536775) |
|
Siswa |
16 |
12 |
75,00% |
|
Dana |
7.200.000 |
5.400.000 |
75,00% |
|
SDN SUMBERGONDO 02 (20536808) |
|
Siswa |
1 |
0 |
0,00% |
|
Dana |
450.000 |
0 |
0,00% |
|
Total |
Siswa |
138 |
115 |
83,33% |
Total |
Rp |
60.975.000 |
50.625.000 |
83,03% |